Portfolio project schedule
  • 2/3-2/9  finalize the genre of the film opening, start creating the plan , and create a mood board of examples, themes, music, costumes, and makeup that I would like to use in my film.

  • 2/10-2/16  I will  meet with teacher and discuss the film and get all ideas into one, and create the story board and the script for the film. 

  • 2/17-2/23  Get together all the costumes and props needed for film, Get all the music downloaded and ready, if possible and everything is  order I will start to film.

  • 2/24-3/2  Finalize planning completely,  and start the filming process. 

  • 3/3-3/9  Continue to film and get all the shots and music needed. 

  • 3/10-3/16 Look over and make sure everything is filmed and shots are perfected, and begin to edit. 

  • 3/16-3/22 Finalize editing and make sure the film opening is perfected, and make sure no mistakes occur. 